Sprint 3
We have an MVP! (Depending on your definition of functioning) last night the whole team worked really hard to fabricate and assemble the entire structure. We managed to fabricate the entire frame and get 9 origami nodes fabricated and mounted to the frame. Our integrated system was a 3x3 matrix moving in response to motion in the surrounding environment however the gearing system for moving the nodes open and close is not working as well as we expected due the spring force caused by the node that we had not accounted for in our design.
Our goals for the next sprint is to fix our mechanical system so that the nodes open and close smoothly, test and incorporate our motion code for a 3x6 frame, get our web app for controlling the structure up and running, and manufacture the remaining 9 origami node.
Our goals for the next sprint is to fix our mechanical system so that the nodes open and close smoothly, test and incorporate our motion code for a 3x6 frame, get our web app for controlling the structure up and running, and manufacture the remaining 9 origami node.
Comments
Post a Comment